In 2000, the originally projected development cost was €9.5 billion. In 2004 Airbus estimated 1.5 billion euros ($2 billion) would be added for a €10.3 Bn ($12.7Bn) total. In 2006 at €10.2 Billion, Airbus stopped publishing its reported cost and then provisioned €4.9 Bn after the difficulties in electric cabling and two years delay for an estimated total of €18 Bn.

In 2014, the aircraft was estimated to have cost $25bn (£16bn – €18.9bn) to develop. In 2015, Airbus said development costs were €15bn (£11.4bn – $16.95 Bn), though analysts believe the figure is likely to be at least €5bn ($5.65 Bn) more for a €20 Bn ($22.6 Bn) total.In 2016, The A380 development costs were estimated at $25 billion for 15 years, $25–30 billion, or 25 billion euros ($28 billion).
"""
https://en.m.wikipedia.org/wiki/Airbus_A380